Edison Electric Institute (“EEI”), the Electric Power Supply Association (“EPSA”), and
the National Rural Electric Cooperative Association (“NRECA”), (collectively, the “Trade
Associations”) on behalf of our member companies, respectfully submit these comments, in
response to the Notice of Inquiry (“NOI”) issued by the Federal Energy Regulatory Commission
(“the Commission” or “FERC”) on July 21, 2016, in the above-referenced docket.1
In the NOI,
the Commission seeks comments on possible modifications to the Critical Infrastructure
Protection (“CIP”) Reliability Standards regarding the cybersecurity of Control Centers2
used to
monitor and control the bulk-power system and any potential impacts on the operation of the
bulk-power system resulting from such modifications. FULL FILING